Studi Kinerja Manajemen Konstruksi pada Proyek Pembangunan Kantor DPRD Sabu Raijua
Construction Management Performance Study in the Sabu Raijua DPRD Office Development Project
Abstract
In implementing a project, it is inevitable that various problems will slowly
arise which will result in delays, decreased quality, and increased
implementation costs. So this is a serious challenge, how will the problem
be solved with the work system implemented so that the Sabu Raijua
Regency DPRD office project can continue according to the initial plan.
This study aims to determine the implementation of the construction
management work system, determine the factors that influence the
construction management work system and determine the actions that need
to be taken in implementing the construction management work system
using descriptive statistical analysis methods and quantitative analysis. The
results showed that the perceptual analysis resulted in a percentage value of
63%. From the results of the analysis of the mean and IKR, it was found that
the factors that influence the work system based on the most influential
management functions are the evaluation, actuating, organizing, planning,
and controlling functions. As for the actions that need to be taken in
implementing work systems that are most influential based on management
functions are the evaluation, organizing, planning, actuating, and controlling
functions.
Downloads
References
Hadi, Sofwan. (2020). Manajemen Konstruksi (Proyek Jalan Dan Jembatan). Poliban Press : Banjarmasin.
Kaming, Peter F. & Saputra, Ambar Y. (2013). Studi Peran Konsultan Manajemen Konstruksi Pada Tahapan Proyek (079K). Konferensi Nasional Teknik Sipil 7. Universitas Sebelas Maret : Surakarta.
Mustafa, S.A., Kamaruddin, S., Othman, Z., Mokhtar, M. 2009. Ergonomics Awareness andidentifying Frequently Used Ergonomics programs in Manufacturing Industries Using Quality Function Deployment. American Journal of Scientific Research. ISSN 1450-223X Issue 3, pp.51-66.
Purba, Valentio G. (2022). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Lampung. Jurnal Ilmu Teknik.
Sandjojo, Nidjo. (2011). Metode Analisis Jalur (Path Analysis) dan Aplikasinya. Pustaka Sinar Harapan : Jakarta.
Siswanto, Agus B., Pudjihardjo, Hari S., Tutuko, Bambang., Putra, Dicky P., & Zulifah, Sitti. (2022). Analisis Faktor yang Berpengaruh pada Penerapan Pengendalian Waktu, Biaya dan Mutu Pada Proyek Pembangunan Gedung Dinas Kesehatan Kota Semarang. Rang Teknik Journal.
Sugiyono. (2004). Metode Penelitian Bisnis. Alfabeta : Bandung
Sugiyono. (2010). Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif dan R&D. Alfabeta : Bandung
Winoto, Agnes D. Y. (2015). Manajemen Konstruksi Untuk Bangunan. PT. Taka Publisher : Yogyakarta.
Copyright (c) 2023 JURNAL FORUM TEKNIK SIPIL (J-ForTekS)
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal ForTeks memberikan akses terbuka terhadap siapapun agar informasi dan temuan pada artikel tersebut bermanfaat bagi semua orang. Semua artikel jurnal ini dapat diakses dan diunduh secara gratis, tanpa dipungut biaya sesuai dengan lincense creative comons yang digunakan
ForTeks : Jurnal Forum Komunikasi Teknik Sipil is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License