Keywords: Short circuit, El Tari Airport, Low voltage protection, ETAP 12.6

Abstract

All operational activities at the El Tari Kupang airport in meeting their electricity needs are obtained from the electricity supply from PLN. Fulfilling the electricity needs in the airport building is expected to be able to serve lighting loads, motor loads and other loads without any disturbance. The existence of disturbances such as short circuits in the electric power system can cause problems such as damage to electrical equipment and the emergence of power outages. Therefore, problems that arise like this require an analytical study to determine the short-circuit current that will occur while reducing the consequences.

The purpose of this study is to determine the magnitude of the short-circuit fault current and determine the severing capacity of a power breaker in protecting the short-circuit fault current, in the event of a short-circuit fault in the low-voltage panel. Short circuit simulation results with ETAP 12.6.0 will be compared with manual calculations based on positive, negative and zero sequence impedance values from the fault location point.

The results of this study note that the smallest short-circuit fault current is a 1-phase short-circuit fault to ground, with a fault current of 4.82 kA on the Switchgear 2 bus. The largest short-circuit fault current is a 3-phase short-circuit fault, with a fault current of 9 .45 kA on Switchgear 1&2 buses. Determination of the power breaker capacity on the low-voltage panel, the results of the circuit breaker (CB) breaking capacity on Bus Switchgear 1 the breaking capacity value is 10,875 kA, on Bus Switchgear 2 the breaking capacity value is 8.67 kA and on Bus Switchgear 1 & 2 the value its breaking capacity is 14,175 kA.

Downloads

Download data is not yet available.

Author Biographies

Evtaleny R. Mauboy, Universitas Nusa Cendana

Program Studi Teknik Elektro, Fakultas Sains dan Teknik, Universitas Nusa Cendana

Muhamad Iqbal, Universitas Nusa Cendana

Program Studi Teknik Elektro, Fakultas Sains dan Teknik, Universitas Nusa Cendana

References

Suswanto, Daman. “Sistem Distribusi Tenaga Listrik”. Universitas Negeri Padang, 2009.

Fischer J. Patrisius, Analisis Gangguan Hubung Singkat Pada Jaringan Pemakaian Sendiri Pltu Bolok PT. SMSE (IPP) Unit 3 Dan 4 Menggunakan Software Etap 12.6.0, 2019

Asnal Efendi. “Studi Analisa Gangguan hubung Singkat Satu Phasa Ke Tanah Pada SUTT 150 kV Untuk Setting Relay OCR ( Aplikasi GI PIP – PAUH LIMO )” ITP. Padang, 2014.

Daris I. Julian, Analisis Gangguan Hubung Singkat Pada Saluran Udara 20 Kv Di Penyulang Naioni PT. PLN (Persero) ULP Kupang Untuk Menentukan Kapasitas Pemutusan Fuse Cut Out Menggunakan Etap 12.6, 2020

Maria Sagho, Evaluasi Penyetelan Rele Jarak Pada Jaringan Transmisi 70 Kv Bolok – Maulafa Menggunakan Digsilent 15.1.7, 2019

Bonggas L Tobing, Peralatan Tegangan Tinggi. Jakarta: Erlangga, 2012.

Subianto. “Kemampuan Circuit Breaker Dalam Mengatasi Gangguan Pada Jaringan Primer Di Gardu Induk Bukit Asam”, Program Studi Teknik Elektro Fakultas Teknik Universitas Palembang, 2008.