ANALISIS PENURUNAN KINERJA DAYA KELUARAN PADA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) 5 MWP OELPUAH KUPANG DENGAN MENGGUNAKAN SOFTWARE PVSYST

  • Yentri Seran(1)
    Universitas Nusa Cendana
  • Nursalim Nursalim(2)
    Universitas Nusa Cendana
  • Sri Kurniati(3*)
    Universitas Nusa Cendana
  • (*) Corresponding Author
Keywords: Solar Energy, Radiation and Temperature, Tilt and Azimuth, Solar Panels

Abstract

The Independent Power Plant (IPP) of the Oelpuah Solar Power Plant (SPP) in Kupang Regency has been operating since November 2015 with a 5 MWp. However, the maximum power produced has not yet reached optimal power production, only in the 3,000 - 4,000 kW range. Therefore, a study is needed to identify and analyze the decrease in output power. The measurements in December showed that solar radiation, temperature, and equipment damage significantly affected the decrease in output power by 35.7%. Then, based on the simulation results, the output power produced by the array when tilted at 15° and azimuth 0° is 4,000 kW with an E grid of 9,111 MWh/year. This power will increase to 4,100 kW with an E grid of 9,113 MWh/yr when tilt is 14° and azimuth is -5°. Conversely, a decrease in output power can occur due to changes in tilt and azimuth positions by 0.10%. The other influencing factors are internal factors such as 1.68% inverter losses and 3% solar panel quality losses; meanwhile, in terms of external factors such as solar panel losses due to radiation levels (0.16%), temperature (13.5%), GHI (2.40%), and damaged equipment (25%).

Downloads

Download data is not yet available.

Author Biographies

Yentri Seran, Universitas Nusa Cendana

Program Studi Teknik Elektro

Nursalim Nursalim, Universitas Nusa Cendana

Program Studi Teknik Elektro

References

F. Afifudin and F. S. Hananto, "Optimilasasi Tegangan Keluaran dari Solar Cell Menggunakan Lensa Pemfokus dari Cahaya Matahari," Jurnal Neutrino, vol. 04, pp. 164-165, 2 April 2012.

R. Samsu, D. Sungsang, F. Miftahul and C. , "Dampak Bayangan pada Panel Surya Terhadap Daya Keluaran Photovoltaic," Jurnal Ilmiah Setrum, vol. 09, pp. 50-51, Desember 2020.

https://doi.org/10.36055/setrum.v9i2.9202

M. Bactiar, "Prosedur Perencanaan Sistem PLTS untuk Perumahan (Solar Home Sistem)," SMARTek, vol. 4, pp. 176 - 182, Agustus 2006.

P. Harahap, "Implementasi Karakteristik Arus Dan Tegangan PLTS Terhadap Peralatan Trainer Energi Batu Terbarukan," SEMNASTEK UISU, pp. 152 - 157, April 2019.

R. A. Diantari, C. Widyastuti and E. , "Studi Penyimpanan Energi Pada Baterai PLTS," Energi dan Kelistrikan, vol. 9, pp. 120 -125, Juni - Desember 2019.

https://doi.org/10.33322/energi.v9i2.48

Y. Subekti, G. Sarya and R. R. Hastijanti, "Pengaruh Perubahan Intensitas Matahari Terhadap Daya Keluaran Panel Surya," Jurna Pengabdian LPPM, vol. 1, pp. 192 - 202, November 2015.

I. K. S. Negara, I. W. A. Wijaya and A. G. M. Pemayun, "Analisis Perbandingan Output Daya Listrik Panel Surya Sistem Tracking Dengan Solar Reflector," E-Jurnal Spectrum, vol. 3, pp. 7 - 13, Juni 2016.

A. Gifson, M. P. Pambudi and M. R. Siregar, "Rancang Bangun Pembangkit Listrik Tenaga Surya (Plts) On Grid Di Ecopark Ancol," Tesla, vol. 22, pp. 23 -33, Maret 2020.

https://doi.org/10.24912/tesla.v22i1.7333

L. Halim and Oetomo, "Perencanan dan Implementasi Solar Inverter Dengan Pencatatan Daya Pada Pembangkit Listrik Tenaga Surya Off Grid," LPPM Universitas Katolik Parahyangan, Bandung, 2017.

L. I. Company, "Company Profile," Profil Perusahaan, p. 9, 1 Agustus 2020.

O. PLTS Oelpuah, Interviewee, Sistem Pembangkit Listrik Tenaga Surya 5 MWp Oelpuah Kupang. [Interview]. 1 Desember 2021.

C. G. I. Partha, I. W. A. Wijaya and I. G. N. Janardana, "Sistem On Grid Pembangkit Listrik Tenaga Matahari Menggunakan Maximum Power Point Tracking," Teknik Elektro Universitas Udayana, Bandung, 2016.

NASA, Writer, Tingkat Intensitas Radiasi Matahari di Kabupaten Kupang NTT. [Performance]. pvsyst.co, 2021.

P. S. "www.pvsyst.com," 10 juli 2021. [Online]. Available: http://www.pvsyst.com.

G. Earth, AfriGIS (Pty) Ltd., Oelpuah, Kupang/Nusa Tenggara Timur, 2021.

H. Asy'ari1, "INTENSITAS CAHAYA MATAHARI TERHADAP," Simposium Nasional RAPI XI FT UMS - 2012, 2012.

PlumX Metrics

Published
2022-10-30
How to Cite
[1]
Y. Seran, N. Nursalim, and S. Kurniati, “ANALISIS PENURUNAN KINERJA DAYA KELUARAN PADA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) 5 MWP OELPUAH KUPANG DENGAN MENGGUNAKAN SOFTWARE PVSYST”, JME, vol. 11, no. 2, pp. 87 - 96, Oct. 2022.
Section
Articles