Evaluasi Pembiayaan Pembangunan Infrastruktur Pedesaan

Finance Evaluation Rural Infrastructure Development

  • Danang Gunarto(1*)
    Fakultas Teknik, Universitas Tanjungpura
  • Trimawan .(2)
    Universitas Tanjungpura
  • (*) Corresponding Author
Keywords: pembiayaan, infrastruktur, pedesaan

Abstract

Volume estimation and the financial project are essential as technical calculations. This research is to study urban project finances held without proper planning, and the research sample is nine urban. The research method compares the budget available and the estimation calculation based on field observation according to field observation. Unit price analysis use SNI (Standart Nasional Indonesia) method. From the analysis results, the calculated cost and budget ceiling are different. According to field observation, the average budget ceiling is Rp 116,000,000.00, higher than the computed cost of Rp 105,900,000.00. However, according to field observation, the standard deviation of estimation calculation is Rp 46,400,000.00, and the budget is Rp 15,700,000.00. This matter shows that the quality of urban infrastructure projects is varied.

Downloads

Download data is not yet available.

References

Apriliani, Sella Triasari Galuh. 2019. "Optimasi Waktu Dan Biaya Proyek Pembangunan Fasilitas Pelabuhan Waikelo Ntt Dengan Metode CPM".
Astana, I. Nyoman Yudha. 2017. "Estimasi Biaya Konstruksi Gedung Dengan Cost Significant Model". Jurnal Riset Rekayasa Sipil 1(1):7–15.
Bermula, Kerby, Jermias Tjakra, dan Revo L. Inkiriwang. 2020. "Pengendalian Biaya Struktur Konstruksi Beton Bertulang Dengan Menggunakan Analisis Indeks Pada Pembangunan Kalyana Residence Pall 2 Manado". Jurnal Sipil Statik 8(4).
Effendi, Achmad Hidajat. 2007. "Penerapan Nspm Bidang Keselamatan Terhadap Bahaya Kebakaran Dalam Pembangunan Infrastruktur Perumahan Dan Permukiman". Jurnal Standardisasi 9(2):56–63.
Eman, Peter A., Elisabeth M. Lintong, dan Freddy Jansen. 2019. "Estimasi Biaya Konstruksi Menggunakan Metode Parameter Pada Proyek Pemeliharaan Berkala Jalan Di Kota Manado". Jurnal Ilmiah Media Engineering 8(2).
Hidayah, Rohmatun, Ahmad Ridwan, dan Yosef Cahyo. 2018. "Analisa Perbandingan Manajemen Waktu Antara Perencanaan Dan Pelaksanaan". Jurnal Manajemen Teknologi dan Teknik Sipil 1(2):281–90.
Pratama, Dani, dan Sentosa Limanto. 2017. "Studi Kasus Harga Satuan Upah Dan Bahan Untuk Proyek Bangunan Satu Lantai". Jurnal Dimensi Pratama Teknik Sipil 6(2):28–33.
Pratasis, Pingkan Ane Kristy. 2013. "Pengendalian Biaya Dengan Cash Flow Studi Kasus Pada Proyek Pembangunan Gedung Kantor Universitas X". Tekno 10(57).
Sahiman, Sahiman, dan Fameira Dhiniati. 2016. "Analisis Rencana Anggaran Biaya Pada Proyek Peningkatan Jalan Aur Duri–Rantau Unji (A. Hotmix) Tahap Iii Sepanjang 3, 2 Km Kota Pagar Alam". Jurnal Ilmiah Bering’S 3(1):21–27.
Simanjuntak, Manlian Ronald A., dan Victor Victor. 2020. "Analisis Faktor–Faktor Manajemen Pembiayaan Proyek Yang Dikerjakan Kontraktor Pada Proyek Konstruksi Di Tangerang". Prosiding Snitt Poltekba 4:479–85.
Wospoga, Refi, dan Nurul Wardhani. 2015. "Analisa Pembiayaan Proyek Pembangunan Lanjutan Gedung Laboratorium Terpadu Fkip Universitas Tanjungpura Pontianak". Jurnal Mahasiswa Teknik Sipil Universitas Tanjungpura 2(2).

PlumX Metrics

Published
2022-05-28